Flashing a Control Board (SD Recovery)Flashing a Control Board (SD Recovery)Make the SD card correctly
- 1Use a SMALL, name-brand microSD: 2-16 GB (SanDisk/Samsung/Kingston). Cards >32 GB frequently fail - the bootloader can't read exFAT/SDXC.
- 2Format the card FAT32.
- 3Download the correct recovery image for the EXACT model from the manufacturer.
- 4UNZIP the image and copy its CONTENTS onto the card (don't just drop the .zip on it).
- 5Tools: balenaEtcher (easiest, cross-platform), Win32DiskImager, or Rufus (Windows).
Flashing a Control Board (SD Recovery)Flashing a Control Board (SD Recovery)Antminer SD recovery procedure
Before using this checklist: SD-slot position (left vs right of the Ethernet port) changes the procedure on some models - check that model's page.
- 1Power OFF the miner.
- 2Insert the prepared microSD into the control board's card slot.
- 3Power ON - the board auto-loads from the card (~30 s to a few minutes).
- 4When the green LED goes STEADY, flashing is complete. Do NOT interrupt power.
- 5Power off, REMOVE the card, power on - it boots the recovered firmware.
- 6Reconfigure network + pools (config was wiped) and verify the version.
Mining Software & Braiins ToolboxMining Software & Braiins ToolboxBraiins Toolbox (install & manage Braiins OS+)
Braiins Toolbox is the GUI+CLI app for installing and managing Braiins OS+ firmware across Antminers - no SD card needed for most units.
- 1Download Braiins Toolbox from braiins.com and the firmware package for your exact model.
- 2Verify the download checksum (SHA-256) against the published value.
- 3Confirm the miner is reachable on the LAN; note its IP.
- 4GUI: point Toolbox at the miner IP(s) and run Install. CLI equivalent: bos-toolbox install <MINER_IP>.
- 5Enter miner credentials when prompted (factory default often root/root).
- 6Wait ~5-10 min - Toolbox auto-BACKS-UP the stock firmware, then the miner reboots into Braiins OS+.
- 7Browse to the miner IP, change the password, set a Power/Hashrate target and pools.
- 8Uninstall/revert: bos-toolbox uninstall <MINER_IP> restores the backup.
Mining Software & Braiins ToolboxMining Software & Braiins ToolboxBitmain APMinerTool (Antminer batch)
- 1Scan one or more IP ranges to enumerate every Antminer (IP/MAC/model/status).
- 2Select many units -> push a pool config, firmware image, or reboot in one batch.
- 3Batch-convert DHCP -> static for production racks.
- 4Export the discovered list for your site map/inventory.
Mining Software & Braiins ToolboxMining Software & Braiins ToolboxMicroBT WhatsMinerTool (Whatsminer batch)
Before using this checklist: Whatsminers reject write-API and many monitoring platforms until you change the default password AND flip the API switch in WhatsMinerTool. It's the #1 onboarding gotcha.
- 1Enter an IP range and Start - it lists every Whatsminer with status, temps, and error codes.
- 2CHANGE the admin password and ENABLE the Miner API Switch (required before any write-API/monitoring works).
- 3Batch pool config, firmware upgrade, reboot, power-mode toggle (Low/Normal/High), Fastboot, Restore DHCP.
- 4Export status to CSV for records.
Preventive Maintenance & RMAPreventive Maintenance & RMAThe RMA workflow
- 1Confirm it's a HARDWARE failure (rule out cable/power/config/airflow); capture the exact error string.
- 2Check warranty by serial (the white label near the LAN port). Watch typo traps: O/0, I/1, B/8.
- 3Document: serial, model, purchase proof, fault + error string, photos.
- 4Tag & quarantine the unit (fault + serial + date); pull it from the production row.
- 5Open the vendor ticket and WAIT for a written RMA number (unauthorized returns are refused).
- 6Ship (you pay inbound); keep tracking, update the ticket.
- 7Track credits in a fleet RMA ledger: RMA#, ship date, resolution; reconcile on return.
Dead vs Offline vs No-PoolDead vs Offline vs No-PoolWalk a no-pool / offline fault by layer
Do not jump to the pool or the hardware. Localize the break one layer at a time, lowest layer first.
Before using this checklist: Each layer you clear rules out everything below it. Work bottom-up and you find the break instead of guessing at it.
- 1NIC + switch port: link light on both ends, cable seated, correct port. No link, and nothing above it matters.
- 2IP / gateway / DNS: miner has a valid IP, reaches its gateway, and resolves the pool hostname. A bad gateway or dead DNS looks identical to a dead pool.
- 3Firewall / egress: the stratum port is open outbound - often 3333, or 443 for TLS/encrypted stratum. A blocked egress port stops shares cold.
- 4Pool status: only after your side checks out, load the pool's own status page. The outage may not be yours.
Fault-Triage: Isolate Before You SwapFault-Triage: Isolate Before You SwapWork causes cheapest-and-commonest first
Once classified, chase causes in cost order. The cheapest, most common fix goes first; opening an RMA goes last. Skipping the order is exactly how a good board lands in the RMA pile.
Before using this checklist: An SD reflash often revives a 'dead' or no-boot board before any hardware swap. Rule out software before you call it hardware.
- 1Power - qualified verification of the exact PSU, supply voltage/phase and cabling against model/nameplate requirements; no live reseating.
- 2Network / config - pool URL, worker name, IP, DNS.
- 3Hashboard / ribbon SEATING - reseat the data ribbon AND the board power connectors.
- 4Thermal - dust, blocked airflow, dried paste.
- 5Then and ONLY then - swap the board or open an RMA.
Cooling: Air, Hydro & ImmersionCooling: Air, Hydro & ImmersionHydro install and service review
Use the exact model and facility procedure. This checklist is a review for authorized personnel, not a universal installation sequence.
Before using this checklist: A stopped miner or pump does not establish isolation. Hot, pressurized coolant and stored electrical energy must be controlled before service; do not open fittings to investigate a running loop.
- 1Confirm authorization, the equipment procedure, approved coolant and lifting arrangements before work.
- 2Before connecting, opening, bleeding or removing fittings, isolate the relevant electrical and fluid sources, control stored pressure, allow cooling, and verify safe conditions under that procedure.
- 3Authorized personnel complete the specified connections and checks. Use the manufacturer's fluid-specific chemistry, pressure and flow limits; do not substitute a generic coolant recipe.
- 4Before return to service, complete the required leak, flow and air-removal checks under the approved commissioning procedure; clear personnel and obtain restart clearance before enabling hashing.
- 5For removal, repeat the isolation, depressurization and cooling procedure before disconnecting couplers; drain, contain and store fluid as specified by the manufacturer and SDS.
Cooling: Air, Hydro & ImmersionCooling: Air, Hydro & ImmersionLeak response and PPE
Liquid cooling means liquid can leak, and the two systems fail differently. Hydro leaks are water under pressure near live electronics; immersion leaks are fluid loss that can eventually run a tank dry. Know the response before it happens.
Before using this checklist: Water and energized boards do not mix. On any suspected hydro leak near live electronics, de-energize the affected unit first, then deal with the water. Never reach into a wet, powered machine.
- 1Spot it early: run leak sensors and a secondary containment tray under tanks and CDUs so a drip is caught and alarmed, not discovered later.
- 2Keep clear of liquid near potentially energized equipment and report the leak. Authorized personnel must establish electrical, pressure and thermal safety before fitting work or cleanup; follow the fluid SDS.
- 3Contain and absorb with pads kept near the equipment; keep spare fittings and couplers on hand for a fast reseat.
- 4Wear the PPE: gloves, safety glasses, and closed-toe shoes when handling coolant or fluid; avoid skin and eye contact and follow the fluid's safety data sheet.
- 5After any fluid work, dry and inspect every fitting and connector before you re-energize, and log the incident so a slow recurring leak gets caught.
Commissioning a New MinerCommissioning a New MinerPower-on sequence
Bring it up in order so you can tell a power fault from a network fault from a heat fault.
- 1Confirm the PSU/model match and that DC cables (Antminer) or AC (Whatsminer/Avalon) are fully seated.
- 2For hydro or immersion, confirm coolant is flowing / the tank is filled BEFORE applying power.
- 3Energize the circuit and power the miner; watch that the fans spin up and the status LED comes alive.
- 4Give it a few minutes to boot the control board and initialize the hashboards.
- 5Confirm the Ethernet link light before you go hunting for the IP.
Commissioning a New MinerCommissioning a New MinerVerify it reaches nameplate
Don't call it commissioned until it's actually hashing at spec and the pool sees it. A fresh miner ramps for several minutes while the boards initialize and the firmware auto-tunes, so the first reading will be low. Give it time, then confirm the real numbers.
- 1Wait 3-10+ minutes for all hashboards to initialize and the tuner to settle.
- 2On the miner's dashboard, confirm the pool status shows Alive/Active and accepted shares are climbing.
- 3Confirm the 5-minute/average hashrate is close to the model's nameplate, with all hashboards and all fans present.
- 4Check board temps and fan speeds are in normal range, then log the unit as commissioned against its rack position.
Power & ElectricalPower & ElectricalCurrent and continuous-load headroom
For standard-rated NEC-style continuous-load applications, 125% sizing corresponds to an 80% loading example. Properly applied 100%-rated assemblies have different conditions. Qualified electrical design determines the applicable conductor, breaker, assembly and site limits.
Before using this checklist: Electrical measurements and circuit changes require qualified, authorized personnel. A trip needs investigation and a safe-to-energize determination before any reset under the site procedure. Never increase protective-device ratings to mask a fault.
- 1Review the manufacturer's maximum/input-current requirements and approved circuit design; a point-in-time measurement does not override them.
- 2For a single-phase estimate, RMS current I = P / (V × PF). At unity power factor, 3500 W / 240 V is about 14.6 A; at illustrative PF 0.95 it is about 15.35 A. Neither PF value is an asserted miner specification.
- 3For balanced three-phase total power, I = P / (√3 × line-to-line voltage × PF). Do not apply the single-phase formula to a three-phase total.
- 4In the standard-rated 80% example, a 20 A circuit has a 16 A continuous-load ceiling. Confirm every applicable installation limit before adding or changing loads.
Power & ElectricalPower & ElectricalBalancing miners across breaker sections
A container or row is often split into breaker sections, and each section feeds a set of racks. The site's electrical design gives each section a planning target in kW. That target sits below the breaker's rating to leave headroom. When miners are deployed, they are placed so every section stays at or under its target. A model with higher wall power fills a section with fewer machines, so some slots stay empty on purpose. The Power balance tool in Technician Reference does this math for any section size and model mix, and prints a section worksheet.
Before using this checklist: Rated wall power is a planning figure. Real draw rises with a higher power profile or a hotter room, so keep the target's headroom. Phase balance, breaker trips and any circuit change belong to qualified electrical personnel, and moving or powering miners follows the site's authorization.
- 1Find the section's planning target. If you only have the total approved load, divide it by the number of sections.
- 2Divide the target by one miner's wall power in kW (watts ÷ 1,000) and round down. That is the most miners the section can take.
- 3Spread those miners evenly across the section's racks, putting any extra on the first racks.
- 4For mixed models, multiply each model's quantity by its kW and add the results. The total must stay at or under the target.
- 5Swapping one model for another changes the load by the difference in their wall power. Check the new total before the swap.
Power & ElectricalPower & ElectricalElectrical safety: never work it energized
Everything above is high-current AC that can kill you or arc-flash you. The rule is simple: establish an electrically safe work condition before you touch the copper. NFPA 70E treats de-energizing as the default; energized work is only for qualified persons when de-energizing is truly infeasible. As a technician you rack, cable, and swap machines, tasks that should be done on a dead circuit with the miner unplugged.
Before using this checklist: Arc flash from a fault in switchgear or a PDU can exceed thousands of degrees and blast at lethal distance. Know the arc-flash boundary and required arc-rated PPE for the gear you are near, and never open energized distribution equipment you are not qualified and dressed to work on. Unqualified personnel do not perform lockout/tagout or energized work.
- 1Confirm the task, authorization and exact equipment/site isolation procedure with the responsible team.
- 2Authorized personnel identify and isolate all relevant sources and control stored energy using the required lockout/tagout procedure.
- 3A qualified person verifies electrical isolation using the applicable procedure and suitable inspected test equipment. A switch position, dark LED or stopped fan is not proof.
- 4Service begins only after safe conditions are established. Connection changes require isolation each time; never disconnect live board power connectors.
- 5Complete the required inspection and personnel clearance before controlled return to service; re-isolate before further physical changes.
Power Whips & Metering VoltagePower Whips & Metering VoltageReviewing a supply check
These are evidence-review steps for learners. They are not a live-probing procedure.
Before using this checklist: Only qualified, authorized personnel perform circuit testing. Do not infer conductor function from an unverified color or photo. In this US reference context, green identifies protective grounding, not a phase conductor.
- 1Record the affected miner, PSU label, circuit identification and symptoms without opening electrical enclosures or touching conductors.
- 2Ask the qualified, authorized electrical team to assess the supply using the site procedure and appropriate inspected test equipment.
- 3Compare their documented results against the actual supply topology and the exact equipment input specifications.
- 4Escalate abnormal or uncertain results; keep affected equipment out of service until the responsible team clears return to service.